This user manual article provides an overview of which fields trigger which status changes, when the change takes effect and which specific features may apply depending on the type of intellectual property right.
- An automatic status change occurs only if the designated date field has been completed.
- The status changes only when the calendar date entered in the field is reached (not before).
- If the date lies in the future or is missing, the previous status remains unchanged.
- The status logic is independent of the type of intellectual property right; however, the actual field names may vary.
Overview of status values and triggering fields (extract)
| Status | Triggering date field | Comment |
|---|---|---|
| Filed | Filing date | Status changes on the filing date |
| Published | Publication date | Status changes when the publication date is reached |
| Under examination | Examination request date, if applicable | Status is set as soon as the date of commencement of examination is reached |
| Grant intended | Intended grant date; EP: Rule 71(3) communication | Status follows the date entered |
| Granted | Grant date | Status changes on the grant date |
| Grant published | Grant publication date | Status changes when the date is reached |
| Abandoned | Abandonment | Status changes when abandonment of the intellectual property right has been documented and dated |
| Lapsed | Lapse | Status changes when the date is reached |
| Rejected | Rejection date | Status changes as soon as the rejection date entered is reached. Note: If the date remains entered in this field, the status remains “Rejected” even in the event of subsequent developments such as a successful appeal or grant. |
Specific feature following a subsequent change after rejection
If an intellectual property right is initially rejected and subsequently proceeds following a successful opposition or appeal, the status remains “Rejected” as long as the rejection date remains entered in the relevant date field.
For Continux to determine the current procedural status based on subsequent events, the no longer current rejection date must be removed from the field. The previous rejection may be documented in the notes. The subsequent date fields, for example for the intended grant or grant, can then determine the current status.
Data maintenance notes
- If a required date is missing, the status remains unchanged.
- Dates should be checked carefully to avoid incorrect status changes.
- Manual corrections are possible in exceptional cases but require the appropriate permissions.
FAQs on individual status values:
➔ How and when does the status change automatically in Continux? – FAQ
➔ When does the status change to Filed? – FAQ
➔ When does the status change to Published? – FAQ
➔ When does the status change to Granted? – FAQ
➔ Why does the status Rejected remain despite a subsequent grant? – FAQ
➔ Manual status selection – the provisional status in Continux (forthcoming)
War dieser Artikel hilfreich?
Das ist großartig!
Vielen Dank für das Feedback
Leider konnten wir nicht helfen
Vielen Dank für das Feedback
Feedback gesendet
Wir wissen Ihre Bemühungen zu schätzen und werden versuchen, den Artikel zu korrigieren